ENGINEER’S REPORT – Spotts, Stevens and McCoy REPORT- 2025
- I reviewed the Chapter 9 reports and recommend we have the pump station pumps serviced as Mohrsville Pump #1 ran 1195 hours in 2024 vs Pump @ at 508 hours. This is obviously twice as long each month indicating worn pump impellers or a check valve issue. Dauberville is not as drastic, but Pump #1 ran for 212 hours vs Pump #2 270 hours (roughly 25% difference). Woody met with Axiom to obtain quotes for each of the pump stations to have annual PMs performed, only doing one per year and then rotating to the second site the following year. He is also getting a quote on a new pump to have as a spare. PM quotes attached. I spoke to Axiom again this week to request the spare pump quote.
- Excel spreadsheet attached for your files. Will continue to update as we continue to make copies.
- Tiny Pear update: SSM was onsite 6/26 as requested by excavator. After noting several issues of flooding in the trenches, we had to retur on 6/27 and 6/30. Sewer is connected and approved. Field reports to follow.
- Hillcrest Grant Update: SSM prepared the Hillcrest Driveway Paving and Improvements Bid Proposal. SSM has prepared the recommendation letter for approval.
- Lateral issue at Dauberville Pump Station. Testing results 1,000 cfu/100. Recommend having the lateral televised. I reached out to Ditchcreek for a quote. Update, pipe effluent was covered. Woody has requested the help of the road crew to uncover.
- We have prepared the proposal to perform the three NPDES Permit Renewals. Proposal attached for consideration.
- Update from Woody on the Generator.
- Discuss the signature pages for Edmr login for the three plants.
Jamie will be sending over the bid results with the letter of recommendation for consideration to award the driveway project.
OPERATIONS AND MAINTENANCE REPORT:
Verbal Report due to not receiving ARRO Bills for 3 months.
BUSINESS
- Audits 2022 & 2023 & 2024
- Tiny Pear Apartments billing for 7 properties—9 mail boxes
- See attached email chain from 2015 Vision regarding updates to the property.
Adjournment:
AGENDA